Bathroom Remodeling · Greater Boston

Bathroom
Remodeling

The part you'll never see — the waterproofing behind the tile — is the part we're strictest about. That's why our showers don't leak into the ceiling below.

  • Free itemized estimates
  • Serving MA · RI · CT · NH
  • Owner on every job
(774) 235-4906 Mon–Fri 8am–6pm · Call or text
What's included

What we do on a
bathroom remodeling job

  • Full gut bathroom renovations
  • Tub-to-shower conversions with proper slope and drainage
  • Cement board and membrane waterproofing (no green-board shortcuts)
  • Floor and wall tile, niches and benches
  • Vanity, toilet and fixture installation
  • Exhaust fan venting to the exterior — to code
Remodeled bathroom with gray tile walls, rain shower and double bowl vanity
White kitchen with subway tile backsplash and range hood
Process

How the job runs

Same process on every job — you always know what happens next.

01

Assess & measure

We check the subfloor, venting and water pressure first — old Boston houses hide surprises under bathroom floors.

02

Waterproof & inspect

Membrane and pan get flood-tested before a single tile goes up. You see the test.

03

Tile & trim-out

Tile, grout, fixtures, glass. A typical full bath takes 2–3 weeks; you get a working bathroom back on a date we put in writing.

What it costs

A full bathroom remodel in Massachusetts typically runs $15,000–$35,000 depending on tile scope and whether plumbing moves. Tub-to-shower conversions usually land at $9,000–$18,000. Free estimate, line-by-line pricing.

FAQ

Questions homeowners
ask us

How long does a bathroom remodel take?

2–3 weeks for a full gut of a standard bath, once materials are on site. Add a week if we're moving plumbing or dealing with subfloor rot.

Do I need a permit for a bathroom remodel in Massachusetts?

If plumbing or electrical moves, yes — and we pull it. Inspections protect you at resale; skipping them is a false economy.

What's the most common thing you find behind old tile?

Rotted subfloor around the tub and moldy green-board that should never have been in a shower. We photograph it, price the fix, then proceed.

Free estimate

Planning a bathroom remodeling project?

Free estimate, no pressure. Call, WhatsApp, or send the form — Rafael reads every request.